Skip over navigation
Cambridge University Faculty of Mathematics NRich logo
menu search
  • Teachers expand_more
    • Early years
    • Primary
    • Secondary
    • Post-16
    • Events
    • Professional development
  • Students expand_more
    • Primary
    • Secondary
    • Post-16
  • Parents expand_more
    • Early Years
    • Primary
    • Secondary
    • Post-16
  • Problem-Solving Schools
  • About NRICH expand_more
    • About us
    • Impact stories
    • Support us
    • Our funders
    • Contact us
  • search

Or search by topic

Number and algebra

  • The Number System and Place Value
  • Calculations and Numerical Methods
  • Fractions, Decimals, Percentages, Ratio and Proportion
  • Properties of Numbers
  • Patterns, Sequences and Structure
  • Algebraic expressions, equations and formulae
  • Coordinates, Functions and Graphs

Geometry and measure

  • Angles, Polygons, and Geometrical Proof
  • 3D Geometry, Shape and Space
  • Measuring and calculating with units
  • Transformations and constructions
  • Pythagoras and Trigonometry
  • Vectors and Matrices

Probability and statistics

  • Handling, Processing and Representing Data
  • Probability

Working mathematically

  • Thinking mathematically
  • Developing positive attitudes
  • Cross-curricular contexts

Advanced mathematics

  • Decision Mathematics and Combinatorics
  • Advanced Probability and Statistics
  • Mechanics
  • Calculus

For younger learners

  • Early Years Foundation Stage

Aim High

Age 16 to 18
Challenge Level Yellow starYellow star
  • Problem
  • Getting Started
  • Teachers' Resources

  • Warm-up
  • Try this next
  • Think higher
  • Read: mathematics
  • Read: science
  • Explore further
 

A farmer has a very large farm which produces wheat. The yield of wheat per hectare is known to be normally distributed at $7.74$ tonnes per hectare, with a standard deviation of $0.62$.

Why can a normal distribution of a yield never be entirely accurate? Why, in this case, does it not matter?

It is nearly planting time and the farmer has future orders for $8000$ tonnes of wheat. If he fails to produce enough wheat then he will have to pay a stiff penalty to the buyer; if he produces too much wheat then he will have to offload or destroy the surplus at a loss. In each case, the loss $L$ can be modelled as follows, where $A$ is the amount he plants:

$$\begin{align*} &\mbox{If } A < 8000,  L = (8000 - A)\times 4\\
&\mbox{If } A > 8000,  L = 0.5 \times (A-8000)\\\end{align*}$$

There are three possible levels of analysis of this problem

Level 1 - using confidence intervals
How much wheat would the farmer have to plant to have an expected yield of exactly $8000$ tonnes? What distribution would the total yield have, and what would be the $95\%$ confidence interval for the actual yield?

In this case, what would be the $95\%$ confidence interval for the loss?

How would this alter if he instead planted $1000$ hectares? Could you recommend an ideal amount of wheat to plant?

Level 2 - finding an expected loss
For your planting recommendation, what would be the expected loss?

Level 3 - minimising the expected loss (involves difficult, but fun, calculus)
How much should the farmer plant to minimise his expected loss? Make an initial considered estimate before performing a calculation.

 

You may also like

Over-booking

The probability that a passenger books a flight and does not turn up is 0.05. For an aeroplane with 400 seats how many tickets can be sold so that only 1% of flights are over-booked?

Into the Normal Distribution

Investigate the normal distribution

Normal Intersection

Explore the intersection possibilities for normal pdfs.

  • Tech help
  • Accessibility Statement
  • Sign up to our newsletter
  • Twitter X logo

The NRICH Project aims to enrich the mathematical experiences of all learners. To support this aim, members of the NRICH team work in a wide range of capacities, including providing professional development for teachers wishing to embed rich mathematical tasks into everyday classroom practice.

NRICH is part of the family of activities in the Millennium Mathematics Project.

University of Cambridge logo NRICH logo