Skip over navigation
Cambridge University Faculty of Mathematics NRich logo
menu search
  • Teachers expand_more
    • Early years
    • Primary
    • Secondary
    • Post-16
    • Events
    • Professional development
  • Students expand_more
    • Primary
    • Secondary
    • Post-16
  • Parents expand_more
    • Early Years
    • Primary
    • Secondary
    • Post-16
  • Problem-Solving Schools
  • About NRICH expand_more
    • About us
    • Impact stories
    • Support us
    • Our funders
    • Contact us
  • search

Or search by topic

Number and algebra

  • The Number System and Place Value
  • Calculations and Numerical Methods
  • Fractions, Decimals, Percentages, Ratio and Proportion
  • Properties of Numbers
  • Patterns, Sequences and Structure
  • Algebraic expressions, equations and formulae
  • Coordinates, Functions and Graphs

Geometry and measure

  • Angles, Polygons, and Geometrical Proof
  • 3D Geometry, Shape and Space
  • Measuring and calculating with units
  • Transformations and constructions
  • Pythagoras and Trigonometry
  • Vectors and Matrices

Probability and statistics

  • Handling, Processing and Representing Data
  • Probability

Working mathematically

  • Thinking mathematically
  • Developing positive attitudes
  • Cross-curricular contexts

Advanced mathematics

  • Decision Mathematics and Combinatorics
  • Advanced Probability and Statistics
  • Mechanics
  • Calculus

For younger learners

  • Early Years Foundation Stage

Aim High

Age 16 to 18
Challenge Level Yellow starYellow star
  • Problem
  • Getting Started
  • Teachers' Resources

Why do this problem?

This problem offers the opportunity for a statistical investigation of confidence intervals and expectations at various levels of sophistication.

Possible approach

There are three possible levels at which this problem can be tackled, and how it is used depends on the levels of the students. As an exercise in confidence intervals it is relatively simple from a calculational point of view; the interest lies in making the right decisions for the overall final planting recommendation. There are various ways in which students might do this, from making a few sensible guesses and extrapolating, to doing a numerical investigation.

The second parts in which the expectations are found are more difficult. They will require a sophistication in manipulating integrals, changing variables in integrals and using the Erf or CumNorm functions. This would be a good task to use in this way to draw together many strands from a study of statistics.

Key questions

Why can a yield never be modelled exactly by a normal distribution?
How are the sums of 2, 3, 4, ... identical normal distributions distributed?
Why is the mean target of 8000 tonnes clearly not a good one?
What is the formula for expectation in terms of an integral?

Possible extension

Parts 2 and 3 of this question naturally offer extension.

Possible support

Focus only on the first part of the question, which forms a nice self-contained task. However, it is worth discussing with students that methods exist to take the analysis to a higher level.

You may also like

Over-booking

The probability that a passenger books a flight and does not turn up is 0.05. For an aeroplane with 400 seats how many tickets can be sold so that only 1% of flights are over-booked?

Into the Normal Distribution

Investigate the normal distribution

Normal Intersection

Explore the intersection possibilities for normal pdfs.

  • Tech help
  • Accessibility Statement
  • Sign up to our newsletter
  • Twitter X logo

The NRICH Project aims to enrich the mathematical experiences of all learners. To support this aim, members of the NRICH team work in a wide range of capacities, including providing professional development for teachers wishing to embed rich mathematical tasks into everyday classroom practice.

NRICH is part of the family of activities in the Millennium Mathematics Project.

University of Cambridge logo NRICH logo